The 2020 Measure K-14 Repair and Rehabilitation project kicked off in Grover Beach. North Coast Engineering completed the design and is providing post-design and post-construction services for the rehabilitation of several sections of streets as a part of the 2020 Measure K-14 repair and rehabilitation project, approximately 2.5 miles. The project includes:
Civil Services
- Removal and replacement of existing roadway
- Road profile design for improved drainage
- Restriping and traffic control plans
- Sidewalk infill
- Upgrading ADA ramps
- Bid Assistance
- Construction Engineering
Survey Services
- Boundary Survey
- Topographic Mapping
- Pre and post-construction Record of Survey
Beginning in 2014, voters approved Measure K-14, the Grover Beach Street Rehabilitation; Safety Improvement Bond Measure. The multi-year program issued up to $48 million in bonds to fund street repair and rehabilitation work (including ADA-compliant curb ramp improvements) throughout Grover Beach. City Council held public meetings and issued a citizen survey to gather input from the public on preferred street repair priorities.
The project is scheduled to be completed later this year.
Meet Our Team
Greg Jaeger, PE
President & CEO
John Luttman, PE
Vice President & Principal Engineer, QSD/P
Tucker Sanders, PLS
Vice President & Survey Manager
Have a project in mind?
We would love to hear from you and show you what we can do for your next project.
nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127