The 2020 Measure K-14 Repair and Rehabilitation project kicked off in Grover Beach. North Coast Engineering completed the design and is providing post-design and post-construction  services for the rehabilitation of several sections of streets as a part of the 2020 Measure K-14 repair and rehabilitation project, approximately 2.5 miles. The project includes:

Civil Services

  • Removal and replacement of existing roadway
  • Road profile design for improved drainage
  • Restriping and traffic control plans
  • Sidewalk infill
  • Upgrading ADA ramps
  • Bid Assistance
  • Construction Engineering

Survey Services

  • Boundary Survey
  • Topographic Mapping
  • Pre and post-construction Record of Survey

Beginning in 2014, voters approved Measure K-14, the Grover Beach Street Rehabilitation; Safety Improvement Bond Measure. The multi-year program issued up to $48 million in bonds to fund street repair and rehabilitation work (including ADA-compliant curb ramp improvements) throughout Grover Beach. City Council held public meetings and issued a citizen survey to gather input from the public on preferred street repair priorities.

The project is scheduled to be completed later this year.

Meet Our Team 

Greg Jaeger, PE

Greg Jaeger, PE

President & CEO

John Luttman, PE

John Luttman, PE

Vice President & Principal Engineer, QSD/P

Tucker Sanders, PLS

Tucker Sanders, PLS

Vice President & Survey Manager

Have a project in mind?

We would love to hear from you and show you what we can do for your next project.

nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127