Construction broke ground on Templeton Place II near the intersection of Petersen Ranch Road and Bennet Way in Templeton. The project is a 36-unit low-income senior and veteran’s apartment development. The development includes:

  • Four studio apartments
  • Twenty-seven one-bedroom
  • Five two-bedroom
  • Community center
  • Community garden

This development is an expansion of Templeton Place I located south of the site, which was completed in 2001. Providing  29-unit apartments dedicated to affordable senior housing. Together, the Phase I and II development offers an open, relaxed environment that fosters interaction among the residents.

North Coast Engineering partnered with People’s Self-Help Housing and IBI Group to prepare the Civil design for this project. The scope included grading and drainage design that meets post construction stormwater control requirements from California’s RWQCB, utility design, and SWPPP development. NCE will assist with construction administration and  construction staking for the Contractor, Spurr Co.

Templeton Place II is scheduled to be completed by fall 2022. For more information on Templeton Place II and how to apply for housing, visit the link below.

CLICK HERE!

To see a video that People’s Self-Help Housing put together about Templeton Place II – Under Construction, see the link below.

https://www.youtube.com/watch?v=nivJpgPVDEM&feature=youtu.be

 

Meet Our Team 

Greg Jaeger, PE

Greg Jaeger, PE

President & CEO

John Luttman, PE

John Luttman, PE

Vice President & Principal Engineer, QSD/P

Tucker Sanders, PLS

Tucker Sanders, PLS

Vice President & Survey Manager

Have a project in mind?

We would love to hear from you and show you what we can do for your next project.

nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127