creston road corridor improvements

size

2.1 Miles

location

Paso Robles, CA

completion year

TBD

About this Project

North Coast Engineering prepared construction documents for the Creston Road Corridor for Niblick Road to South River Road. This 2.1-mile section of the road is a vital artery connecting the south side of the City with the north side. Included in the design is the evaluation of all ADA curb ramps and driveways, a complete pavement rehabilitation, additional pedestrian signals, installation of the City’s first roundabout, installation of a communication conduit and installation of a sewer line. The voters approved the Sales Tax Measure in addition to the Gas Tax Monies, which funded this project.

CLIENT

  • CITY OF EL PASO DE ROBLES

PROJECT TYPE

  • MUNICIPAL

SENIOR STAFF / PROJECT MANAGERS

  • GREG JAEGER, PE
  • TUCKER SANDERS, PLS
  • JOHN SANDERS, PLS

PROJECT ENGINEER

  • JOHN LUTTMAN, PE

services used

 

civil engineering

  • Sewer Design
  • Storm Drain Design
  • Utility Coordination
  • Grading
  • Streets and Highways
  • Low Impact Development
  • Stormwater Pollution Prevention Plan (SWPPP)
  • Rough Grading Plans
  • Earthwork
  • Construction Management and Inspection
  • ADA Accessibility Review

surveying & mapping

  • Boundary Surveys
  • Topographic Mapping
  • Construction Staking

project development

  • Conformance with Agency Codes & Ordinances
  • Preliminary Review with Agencies 

 

For A Full list of services

  • Civil Engineering
  • Land Surveying & Mapping
  • Construction Staking
  • Land Development
  • Stormwater Management

ATASCADERO ZOO GREEN PARKING LOT

UNION ROAD BIKE LANES

EL CAMINO REAL REHABILITATION AND IMPROVEMENTS

2020 MEASURE K-14 ROAD REPAIR AND REHABILITATION

Have A Project in Mind?

We would love to hear from you and show you what we can do for your next project.

nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127