2020 Measure K-14 Repair and Rehabilitation

North Coast Engineering completed the design and provided bidding services for the rehabilitation of several sections of roadways approximately 2.5 miles. 

Details

Approximately 2.5 Miles

Grover Beach, CA

Project Info

  The project consists of pavement rehabilitation including removal and repair, cape seal and pavement overlay, restriping and traffic control plans; pavement widening and striping lanes, sidewalk infill to complete a continuous pedestrian corridor; upgrading ADA ramps to be compliant and the relocation of a head wall. Plans, specifications and cost estimate were prepared. 

Client:

City of Grover Beach

Completion Year:

2019-2020

Project Type: 

Municipal

Senior Staff / Project Managers: 

Greg Jaeger, PE

Tucker Sanders, PLS

Project Engineer: 

John Luttman, PE

 

Services Used In This Project

Civil Engineering

  • Water Design
  • Storm Drain Design
  • Utility Coordination
  • Grading
  • Streets and Highways
  • Low Impact Development Design
  • Earthwork
  • Construction Management and Inspection
  • ADA Acessibility Review and Design

Surveying and Mapping

  • Boundary Surveys
  • Topographic Mapping
  • Construction Staking

Project Development

  • Conformance with Agency Codes and Ordinances
  • Preliminary Review with Agencies

FOR A FULL LIST OF SERVICES 

Civil Engineering

Surveying and Mapping

Project Development

More projects

Creston Road Corridor Improvements

Highway 41 Multi-Purpose Class I Path

Union Road Bike Lanes

Have a project in mind?

We would love to hear from you and show you what we can do for your next project.

nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127