El Camino Real Rehabilitation and Improvements

North Coast Engineering completed the design and provided construction services for significant improvements to El Camino Real from Oak Park Boulevard to Grand Avenue in the City of Arroyo Grande.

Details

Approximately 1.36 Miles

City of Arroyo Grande

Project Info

 The project consists of pavement rehabilitation including removal and repair, pavement reinforcement fabric and pavement overlay, restriping and traffic control plans; pavement widening  and striping for the addition of Class II bike lanes; sidewalk infill to complete a continuous pedestrian corridor; construction of a soil nail retaining wall to allow street widening; construction of various water line and utility improvements; and a redesign of the City’s Park & Ride facility to provide additional parking spaces, handicap (ADA) access, and transit amenities including a transit shelter, bike racks, and other features. 

Client:

City of Arroyo Grande

Completion Year:

2012

Project Type: 

 Municipal

Senior Staff / Project Managers: 

Greg Jaeger, PE

 John Sanders, PLS

Project Engineer: 

John Luttman, PE

 

Services Used In This Project

Civil Engineering Services

  • Sewer Design
  • Water Design
  • Storm Drain Design
  • Utility Coordination
  • Grading
  • Streets and Highways
  • Earthwork
  • Construction Management and Inspection
  • ADA Accessibility Review and Design

Surveying and Mapping Services

  • Boundary Surveys
  • Topographic Mapping
  • Construction Staking

Project Development Services

  • Conformance with Agency Codes and Ordinances

FOR A FULL LIST OF SERVICES 

Civil Engineering

Surveying and Mapping

Project Development

More projects

Highway 41 Multi-Purpose Class I Path 

2017-2018 F-14 Pavement Rehabilitation 

Atascadero Zoo Green Parking Lot

Have a project in mind?

We would love to hear from you and show you what we can do for your next project.

nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127