creston road corridor improvements
size
2.1 Miles
location
Paso Robles, CA
completion year
TBD
About this Project
North Coast Engineering prepared construction documents for the Creston Road Corridor for Niblick Road to South River Road. This 2.1-mile section of the road is a vital artery connecting the south side of the City with the north side. Included in the design is the evaluation of all ADA curb ramps and driveways, a complete pavement rehabilitation, additional pedestrian signals, installation of the City’s first roundabout, installation of a communication conduit and installation of a sewer line. The voters approved the Sales Tax Measure in addition to the Gas Tax Monies, which funded this project.
CLIENT
- CITY OF EL PASO DE ROBLES
PROJECT TYPE
- MUNICIPAL
SENIOR STAFF / PROJECT MANAGERS
- GREG JAEGER, PE
- TUCKER SANDERS, PLS
- JOHN SANDERS, PLS
PROJECT ENGINEER
- JOHN LUTTMAN, PE
services used
civil engineering
- Sewer Design
- Storm Drain Design
- Utility Coordination
- Grading
- Streets and Highways
- Low Impact Development
- Stormwater Pollution Prevention Plan (SWPPP)
- Rough Grading Plans
- Earthwork
- Construction Management and Inspection
- ADA Accessibility Review
surveying & mapping
- Boundary Surveys
- Topographic Mapping
- Construction Staking
project development
- Conformance with Agency Codes & Ordinances
- Preliminary Review with Agencies
For A Full list of services
- Civil Engineering
- Land Surveying & Mapping
- Construction Staking
- Land Development
- Stormwater Management
ATASCADERO ZOO GREEN PARKING LOT
UNION ROAD BIKE LANES
EL CAMINO REAL REHABILITATION AND IMPROVEMENTS
2020 MEASURE K-14 ROAD REPAIR AND REHABILITATION
Have A Project in Mind?
We would love to hear from you and show you what we can do for your next project.
nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127