Creston Road Corridor Improvements
North Coast Engineering prepared construction documents for the Creston Road Corridor for Niblick Road to South River Road.
Details
Approximately 2.1 Miles
City of Paso Robles



Project Info
This 2.1-mile section of the road is a vital artery connecting the south side of the City with the north side. Included in the design is the evaluation of all ADA curb ramps and driveways, a complete pavement rehabilitation, additional pedestrian signals, installation of the City’s first roundabout, installation of a communication conduit and installation of a sewer line. The voters approved the Sales Tax Measure in addition to the Gas Tax Monies, which funded this project.
Client:
City of El Paso de Robles
Completion Year:
TBD
Project Type:
Municipal
Senior Staff / Project Managers:
Greg Jaeger, PE
John Sanders, PLS
Tucker Sanders, PLS
Project Engineer:
John Luttman, PE
Services Used In This Project

Civil Engineering
- Sewer Design
- Storm Drain Design
- Utility Coordination
- Grading
- Streets and Highways
- Low Impact Development
- Stormwater Pollution Prevention Plan (SWPPP)
- Rough Grading Plans
- Earthwork
- Construction Management and Inspection
- ADA Accessibility Review

Surveying and Mapping
- Boundary Surveys
- Topographic Mapping
- Construction Staking

Project Development
- Conformance with Agency Codes and Ordinances
- Preliminary Review with Agencies
FOR A FULL LIST OF SERVICES
Civil Engineering
Surveying and Mapping
Project Development
More projects
Atascadero Zoo Green Parking Lot
El Camino Real Rehabilitation and Improvements
Union Road Bike Lanes
Have a project in mind?
We would love to hear from you and show you what we can do for your next project.
nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127