HuerHuero creek flood study

size

Unknown

location

Paso Robles, CA 

completion year

2020

About this Project

North Coast Engineering completed the flood study for to determine the 50 and 100-year peak flows and flood limits along a portion of the HuerHuero Creek.  The purpose of this study is to determine the 50 and 100-year peak flows and flood limits along a portion of the Huerhuero Creek for a proposed project consisting of a bridge crossing the Huerhuero and path along the creek. Peak Flow was estimated using the Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) computer program developed by the Army Corps of Engineers (ACOE). The results of this study will be used to analyze scour for the proposed bridge and for improvements at the existing Highway 46 Bridge. 

CLIENT

  • CITY OF PASO ROBLES

PROJECT TYPE

  • FLOOD MAPPING

SENIOR STAFF / PROJECT MANAGERS

  • GREG JAEGER, PE
  • TUCKER SANDERS, PLS

PROJECT ENGINEER

  • JOHN LUTTMAN, PE

services used

 

civil engineering

  • Waterway Modeling/ Flood Studies and Mapping

surveying & mapping

No survey services were used on this project.

project development

No project development services were used on this project. 

 

For A Full list of services

  • Civil Engineering
  • Land Surveying & Mapping
  • Construction Staking
  • Land Development
  • Stormwater Management

SAN MARCOS DAM INUNDATION MAP

ROBERT NICHOLS RANCH FLOOD STUDY

SHANDON COMMUNITY PLAN FLOOD ANALYSIS

ALAMO SPRINGS SOLAR RANCH FLOOD CONSTRAINT

Have A Project in Mind?

We would love to hear from you and show you what we can do for your next project.

nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127