San Marcos Dam Inundation Map

North Coast Engineering completed the inundation map for the Department of Water Resources. 

Details

Approximately 10 Miles

San Luis Obispo County, CA

Project Info

  The Department of Water Resources requires dam owners to perform a dam breach study every ten years to create an emergency response in case of failure. Our team modeled the breach of a 40-foot tall dam and the impacted area downstream from the dam. The simulation includes 407 acre-feet of water traveling over 10 miles through the San Marcos creek in just under two hours. NCE was able to map the inundated area in color pdfs for safety officials to prepare an emergency action plan (EAP) in response to a dam failure.  

Client:

Chimney Rock Ranch

Completion Year:

2020

Project Type: 

Flood Mapping

Senior Staff / Project Managers: 

Greg Jaeger, PE

Project Engineer: 

John Luttman, PE

 

Services Used In This Project

Civil Engineering

  • Waterway Modeling/ Flood Studies and Mapping

Surveying and Mapping

Project Development

FOR A FULL LIST OF SERVICES 

Civil Engineering

Surveying and Mapping

Project Development

More projects

Huerhuero Flood Analysis

Shandon Community Plan Flood Analysis

Alamo Springs Solar Ranch-Flood Constraint

Have a project in mind?

We would love to hear from you and show you what we can do for your next project.

nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127