2020 measure k-14 repair and rehabilitation

size

2.5 Miles

location

Grover Beach, CA

completion year

2022

About this Project

North Coast Engineering completed the design and provided bidding services for the rehabilitation of several sections of roadways approximately 2.5 miles. The 2020 Measure K-14 Repair and Rehabilitation project kicked off in Grover Beach. North Coast Engineering completed the design and is providing post-design and post-construction services for the rehabilitation of several sections of streets as a part of the 2020 Measure K-14 repair and rehabilitation of several sections of streets as a part of the 2020 Measure K-14 repair and rehabilitation project, approximately 2.5 miles. 

CLIENT

  • ALMOND ACRES CHARTER SCHOOL

PROJECT TYPE

  • EDUCATION

SENIOR STAFF / PROJECT MANAGERS

  • GREG JAEGER, PE
  • TUCKER SANDERS, PLS

PROJECT ENGINEER

  • JOHN LUTTMAN, PE

services used

 

civil engineering

  • Water Design
  • Storm Drain Design
  • Utility Coordination
  • Grading
  • Streets and Highways
  • Low Impact Development Design
  • Construction Management and Inspection
  • ADA Accessibility Review & Design

surveying & mapping

  • Boundary Surveys
  • Topographic Mapping

project development

  • Conformance with Agency Codes & Ordinances
  • Preliminary Review with Agencies

 

For A Full list of services

  • Civil Engineering
  • Land Surveying & Mapping
  • Construction Staking
  • Land Development
  • Stormwater Management

CRESTON ROAD CORRIDOR IMPROVEMENTS

HIGHWAY 41 MULTI-PURPOSE CLASS I PATH

EL CAMINO REAL REHABILITATION AND IMPROVEMENTS

UNION ROAD BIKE LANES

Have A Project in Mind?

We would love to hear from you and show you what we can do for your next project.

nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127