2020 measure k-14 repair and rehabilitation
size
2.5 Miles
location
Grover Beach, CA
completion year
2022
About this Project
North Coast Engineering completed the design and provided bidding services for the rehabilitation of several sections of roadways approximately 2.5 miles. The 2020 Measure K-14 Repair and Rehabilitation project kicked off in Grover Beach. North Coast Engineering completed the design and is providing post-design and post-construction services for the rehabilitation of several sections of streets as a part of the 2020 Measure K-14 repair and rehabilitation of several sections of streets as a part of the 2020 Measure K-14 repair and rehabilitation project, approximately 2.5 miles.
CLIENT
- ALMOND ACRES CHARTER SCHOOL
PROJECT TYPE
- EDUCATION
SENIOR STAFF / PROJECT MANAGERS
- GREG JAEGER, PE
- TUCKER SANDERS, PLS
PROJECT ENGINEER
- JOHN LUTTMAN, PE
services used
civil engineering
- Water Design
- Storm Drain Design
- Utility Coordination
- Grading
- Streets and Highways
- Low Impact Development Design
- Construction Management and Inspection
- ADA Accessibility Review & Design
surveying & mapping
- Boundary Surveys
- Topographic Mapping
project development
- Conformance with Agency Codes & Ordinances
- Preliminary Review with Agencies
For A Full list of services
- Civil Engineering
- Land Surveying & Mapping
- Construction Staking
- Land Development
- Stormwater Management
CRESTON ROAD CORRIDOR IMPROVEMENTS
HIGHWAY 41 MULTI-PURPOSE CLASS I PATH
EL CAMINO REAL REHABILITATION AND IMPROVEMENTS
UNION ROAD BIKE LANES
Have A Project in Mind?
We would love to hear from you and show you what we can do for your next project.
nce@northcoastengineering.com
725 Creston Rd Suite C Paso Robles, CA 93446
+1 (805) 239 – 3127