North Coast Engineering was selected to be part of the design-build team by Canyon Building and Design, LLC to prepare the Civil design for the Almond Acres Charter Academy project. The scope included: Grading and drainage design that meets post construction...
Construction broke ground on Templeton Place II near the intersection of Petersen Ranch Road and Bennet Way in Templeton. The project is a 36-unit low-income senior and veteran’s apartment development. The development includes: Four studio apartments Twenty-seven...
John Sanders was the Principal Surveyor and Survey Manager of North Coast Engineering from 1987 until his retirement in December 2020. Over his 33 years at North Coast Engineering, Mr. Sanders built and ran a well-known, respected, and successful survey department....
 Completed in November 2020, the San Marcos Dam Inundation Map is a new project that NCE is excited to share. The Department of Water Resources requires dam owners to perform a dam breach study every ten years to create an emergency response in case of failure. Our...
ASCE is giving back to the community by having a food drive for the Food Bank Coalition of San Luis Obispo County. Donations are being accepted at the locations listed below Monday 11/16 through Tuesday 11/24 from 8am – 5pm (look for collection box at the...