North Coast Engineering was selected to be part of the design-build team by Canyon Building and Design, LLC to prepare the Civil design for the Almond Acres Charter Academy project. The scope included: Grading and drainage design that meets post construction...
Construction broke ground on Templeton Place II near the intersection of Petersen Ranch Road and Bennet Way in Templeton. The project is a 36-unit low-income senior and veteran’s apartment development. The development includes: Four studio apartments Twenty-seven...
John Sanders was the Principal Surveyor and Survey Manager of North Coast Engineering from 1987 until his retirement in December 2020. Over his 33 years at North Coast Engineering, Mr. Sanders built and ran a well-known, respected, and successful survey department....
Completed in November 2020, the San Marcos Dam Inundation Map is a new project that NCE is excited to share. The Department of Water Resources requires dam owners to perform a dam breach study every ten years to create an emergency response in case of failure. Our...
The Oak Park Community Redevelopment project has now completed its fourth and final phase of the project. Phase 4 adds 75 new, affordable apartments that consist of 21 one-bedroom, 34 two-bedroom, and 20 three-bedroom units. Originally constructed as a World War II...
Twin Creeks is a mixed-use development project located in San Luis Obispo. It includes 94 residential units, 2460 square feet of indoor residential amenity space, outdoor residential amenity space, and 3,490 square feet of commercial space. The new apartments will...